Suzhou Industrial Park

Home page > category report > Infrastructure & Ecology


SIP Installs the Country's Longest Steel Truss in Bridge Building


Date:   |   Source:       Font Size:    A   A   A

 

Prior to the Spring Festival, in the bridge building project over Wusong River in Suzhou Industrial Park, the installation of all the steel trusses was completed, for the next phase of bridge surface paving. The project is one of the key items in the construction of SIP section of Central Ring Speedway, and the bridge is expected to open to traffic in the middle of 2015.

   

Wusong River Bridge is located on the southeast corner of the Central Ring Speedway, on the borderline between SIP and Wuzhzong District, linking with Xinghua Street on the north bank and Suzhou-Tongli-Lili Highway on the south bank, mutually accessible with Dongfang Revenue. The bridge is structured with 120-meter-long steel trusses, on which are paved with 10-lane 2-way driveways, each as wide as 24.6 meters.


March 3, 2015